Front end Tipping System - Diamond Series
3 to 6 Stages
FE/FC/FEE/ Type Mounting
Sizes 110 - 214
Stroke - Upto 8.6 meters
Vehicle Tonnage - 16 to 90T GVW
Under body Tipping System
2 to 10 Stages
Bore - 65mmØ - 120mmØ
Vehicle Tonnage - 1T to 50T GVW
Option: Single or Double Jack
range
Stabilising Front-end range (JTC/D)
Non-stabilising Front-end range (ETE, ETV)
Single Ram Under Body (TT, SUT)
Twin Ram Under Body (RT)
Truck Steering Cylinder
Auxiliary Hydraulic Steering Cylinder for
8 x 2 and 8 x 4 trucks
Hydraulic Agg...
| Company Name | Wipro Infrastructure Engineering |
| Contact | Mr.Balamururugan Thiyagarajan |
| Address | Dubai airport free zone, , |
| City | Dubai |
| Country | United Arab Emirates |
No brochures available at the moment.
Interested in working with Wipro Infrastructure Engineering? Submit your details below and we’ll connect you directly with the company for quotes, product info, or any questions you may have.
Get to know the professionals behind Wipro Infrastructure Engineering, a leading company in UAE. Our dedicated team members bring expertise, experience, and a passion for excellence to every project.